FLJÓTSDALSSTÖÐ Hydropower Project

PROJECT DETAILS

Project name: Fljótsdalsstöð Hydropower Project

Project location: East Iceland

Installed capacity: 690 MW 

Project owner: Landsvirkjun 

 

ASSESSMENT DETAILS

Assessment tool: Hydropower Sustainability Standard

Assessment stage: Operation

Assessment date: 16 – 22 September 2024 

 

ASSESSOR team

 

sustainability assessment overview

The Fljótsdalsstöð/Kárahnjúkar hydropower project was first assessed in 2017 using the Hydropower Sustainability Assessment Protocol (HSAP), showing strong sustainability performance. In 2024, a new assessment confirmed that the project continues to perform at a high level, with improvements in some areas. It complies with all sustainability commitments, supported by extensive monitoring and effective management of environmental issues.
The project also has an exceptionally low carbon footprint of 1.2 gCO2e/kWh. At the corporate level, sustainability is fully integrated into operations and transparently reported through the company’s Annual Report, following international standards like GRI and CDP.

The public consultation period for the assessment report of the Fljótsdalsstöð project is open from 9 January 2025 to 10 March 2025.

Evidence of report distribution plan is available here