Sebzor Hydropower Project

Project details

Project name: Sebzor Hydropower Project

Project location: Shokhdara River, Tajikistan

Installed capacity: 11 MW

Project owner: Pamir Energy Co. (PEC)

Assessment details

Assessment tool: Hydropower Sustainability Gap Analysis Tool (HESG)

Assessment stage: Preparation

Assessment date: 9 - 18 August 2021

 

Assessor for this project

Joerg Hartmann

 
 

Assessment overview

The assessment found that Sebzor HPP will make a significant positive impact to climate change mitigation by providing a very low-carbon source of power and displacing high-carbon energy sources such as firewood, diesel and coal. The project’s environmental impacts are relatively minor due to its small footprint (small reservoir, low diversion weir and limited land disturbance as the pipeline is laid into the existing roadway) and limited biodiversity values.

The project has well-developed processes for labour management and Operation Health and Safety as a result of Pamir Energy’s extensive experience and reputation as one of the most important and attractive employers in the Gorno-Badakhshan Autonomous Oblast region of Tajikistan.

The project has two significant gaps in the Community Impacts and Infrastructure Safety topic. Plans are in place to resolve the gaps in the coming 6 months.

The project’s HESG assessment report underwent a 60-day public consultation period, which ended on 17 December 2021.

The Sebzory hydropower project earned a Gold certification against the Hydropower Sustainability Standard in March 2023. Consult the projects HS Standard assessment page.

Results

Previous
Previous

São Simão Hydroelectric Power Plant

Next
Next

Stortemelk Hydropower Plant