DIBWANGUI

PROJECT DETAILS

Project name: Dibwangui

Project location: Ngounie Province, Gabon

Installed capacity: 15.4 MW

Project owner: FGIS/Eranove Group

 

ASSESSMENT DETAILS

Assessment tool: Hydropower Sustainability ESG Gap Analysis Tool (HESG)

Assessment stage: Preparation

Assessment date: September 2019 - October 2020, with an on-site assessment on 30 September - 8 October 2019

 

ASSESSESSORS FOR THIS PROJECT

 

ASSESSMENT OVERVIEW

Dibwangui has one significant gap, which is in the Infrastructure Safety section. The environmental and social action plan (ESAP) includes plans for an independent assessment of dam safety, which will be conducted in the coming 1-12 months.

 

RESULTS DIAGRAM